J.R. Mayer
Site Admin / Moderator
Member # 713

Icon 1 posted      Profile for J.R. Mayer   Author's Homepage   Email J.R. Mayer         Edit/Delete Post 
I haven't told anyone, but my wife and I are building a home. Things have gone super fast, but our closing is scheduled for June 20th... which is 15 business days away.. and 21 calandar days away.

Our house has all the electrical, heating, cooling, plumbing done.

At this point the following has NOT been accomplished:

- sheet rock and mud/taping
- insulation
- popcorn ceilings
- wood floors, cabinets, railings, staining
- inside painting
- installation of toilets and sinks
- electrical wall plates and switches installed
- electrical box finished up
- painting the interior of the house
- paintint the exterior of the house
- driveway poured
- cleanup of misc debris inside house
- installation of permanant doors on house
- installation of lighting fixtures
- installation of carpeting inside
- installation of bathroom tile

Does all this sound reasonable in the amount of time I mentioned?

BTW: Not to mention our warranty walkthrough is scheduled for the 18th.. so shave two days off that... plus the mortgage company is going to want an inspector in there to make sure everthing is peachy and ready for closing.

[ 29 May 2002: Message edited by: J.R. Mayer ]



--------------------
J.R. Mayer
2002 Camaro SS - 35th Anniversary LE
LE Build #57
 -
FLP Longtube Headers
Whisper LID w/ K&N Filter
T Byrne MAF Ends
PPC Smooth Bellows

Posts: 596 | From: Kansas City | Registered: Aug 2000  |  IP: Logged
mhayman
2nd Gear
Member # 146

Icon 1 posted      Profile for mhayman   Author's Homepage   Email mhayman         Edit/Delete Post 
Well if everything was worked on constantly for the next three weeks then all of those things could be finished. However, knowing the process of homebuilding, I can say it's pretty certain that it won't all be done in time. But there is a bright side - the work doesn't have to be totally finished for you to move in. Just make sure the doors are in, the plumbing is in and working, and all of the other things that you would need to live day to day. You can live there while the tile goes in, the carpeting, exterior painting, cleanup. Unfortunately, this is how it usually happens. Best fo luck though and congratulations on your new home!

--------------------
Mark H.

Whoever said you couldn't run away from your problems obviously wasn't driving an SS.

Posts: 942 | From: Santa Barbara and Ventura, CA | Registered: Feb 2000  |  IP: Logged
J.R. Mayer
Site Admin / Moderator
Member # 713

Icon 1 posted      Profile for J.R. Mayer   Author's Homepage   Email J.R. Mayer         Edit/Delete Post 
Well... the builder has "never missed a closing".. so who knows.. he says its all under control and will be finished. We'll see.

Thanks for the reply.. if anyone else has an opinion.. shoot it my way.


Posts: 596 | From: Kansas City | Registered: Aug 2000  |  IP: Logged
HotWheelSS aka HTWLSS
SSOA Director
Member # 117

Icon 1 posted      Profile for HotWheelSS aka HTWLSS   Author's Homepage   Email HotWheelSS aka HTWLSS         Edit/Delete Post 
Congrats!!!!

If they really bust their humps, those items could get finished, but don't set yourself up for disappointment. Give it a couple of extra weeks to save some anxiety.

My advice is: Don't move in until absolutely everything is in, even if it delays closing a week or two. If you move in with a bunch of little things unfinished, you'll get comfortable and put it off and it'll never get done. Trust me, I'm speaking from experience. We've lived in our house for 7 years with no base moulding and 5 years without inside trim around our new front window and sliding glass door.

--------------------
Do you own a '96-'02 Camaro SS?
 -
 -  - Teri
Get a limited SSOA diecast while they last
http://thanks.f-body.com
'67 230, 6-cyl Convertible; '68 V-8 TB Convertible; '68 LS1/6-speed; ’72 Z28 for sale; '90 5.7 IROC; '98 Z28 SLP Durability Car; '00+ Camaro "Body in White"; '99 Convertible SS #0069
McGee's Auto Service


Posts: 7198 | From: Near Portland, Oregon, USA | Registered: Feb 2000  |  IP: Logged
J.R. Mayer
Site Admin / Moderator
Member # 713

Icon 1 posted      Profile for J.R. Mayer   Author's Homepage   Email J.R. Mayer         Edit/Delete Post 
Well that problem is solved by the fact that the mortgage company wont allow us to CLOSE without all items being completed.

Also, we have to close by June 25th in order to get our locked interest rate.

Wish us luck


Posts: 596 | From: Kansas City | Registered: Aug 2000  |  IP: Logged
poSSum
AutoXer
Member # 119

Icon 1 posted      Profile for poSSum   Email poSSum         Edit/Delete Post 
Tight but doable. Keep the pressure on the builder ... deliver donuts to the tradesmen to let them know you appreciate their effort
Posts: 4222 | From: Winnipeg MB CA | Registered: Feb 2000  |  IP: Logged
OBSSD
3rd Gear
Member # 1258

Icon 1 posted      Profile for OBSSD   Author's Homepage   Email OBSSD         Edit/Delete Post 
One of the guys at work had a house built last year and I remember he was a bit nervous about a month before the scheduled closing date. At a month away, they were about where yours is now but they pretty much finished it in 3 weeks. It's amazing how fast those crews can work.

--------------------
M01-5810 '01 Onyx/Ebony Leather SS #5810
M6 Hurst, SLP grill, every factory option
325rwhp/345tq
·SLP air lid / Holley Powershot filter / SLP CAI
·SLP Y-pipe
·BMR STB / SLP bolt-on SFCs
·Eradispeed rotors
 -

Posts: 1143 | From: Portland, OR | Registered: Nov 2001  |  IP: Logged
HotWheelSS aka HTWLSS
SSOA Director
Member # 117

Icon 1 posted      Profile for HotWheelSS aka HTWLSS   Author's Homepage   Email HotWheelSS aka HTWLSS         Edit/Delete Post 
Yes, what PoSSum said about the donuts is true.
When our garage was being framed, I brought lunch to the crew every day, or BBQ'd for them. It gave me the chance to check in on things and make sure they had a good meal in them so they'd have the energy to complete the day. I also had a fridge stocked with bottled water, soda pop, fresh fruit and other various snack items on hand.
They really appreciated it and in return, did a very nice job because they got to know us because we were on the jobsite for an hour a day. You don't want to be there too much and look like you're checking up on them, but by allowing them to get to know you and providing some food to show you care about them, too, they'll do a more conscientious job.

Posts: 7198 | From: Near Portland, Oregon, USA | Registered: Feb 2000  |  IP: Logged
DaddySS
Old Coot.....50 going on 20
Member # 848

Icon 1 posted      Profile for DaddySS   Email DaddySS         Edit/Delete Post 
Well first of all congratulations. You don't mention the garage so I will assume you finished that first! The items you have listed could be done in two weeks but it will take a crew of guys working very hard to get it done.

Best of luck.


Posts: 3403 | From: Woodcliff Lake, NJ, USA | Registered: Dec 2000  |  IP: Logged
J.R. Mayer
Site Admin / Moderator
Member # 713

Icon 1 posted      Profile for J.R. Mayer   Author's Homepage   Email J.R. Mayer         Edit/Delete Post 
Thanks for all the replies.. Since all the main labor is done.. the rest is different companies. I would imagine some of them can work at the same time.. etc.. so I guess I shouldnt worry so much.. Thanks for the support guys.. we are just nervous
Posts: 596 | From: Kansas City | Registered: Aug 2000  |  IP: Logged
Harry P
1st Gear
Member # 533

Icon 1 posted      Profile for Harry P           Edit/Delete Post 
Nervous? You're normal, that's all. Of course, getting the punchlist done is dependant on the quality of the crews doing the work. Actually, for developers around suburban Philadelphia, your list is quite doable in the timeframe given. Just as much as you want your mortgage taken out on time, the developer wants his cash without delay as well. Some other good points were raised herein... food & drink to the workers goes a long way for quality and meeting the schedule.

Congrats and enjoy... it will be *almost* as exciting as bringing home the SS.

[ 29 May 2002: Message edited by: Harry P ]


Posts: 184 | From: Harleysville, Pennsylvania | Registered: May 2000  |  IP: Logged
Happy_Dan
Forum Moderator
Member # 118

Icon 1 posted      Profile for Happy_Dan   Author's Homepage   Email Happy_Dan         Edit/Delete Post 
Good luck. Any pics?? It should be done. As long as there are enough people and they are well coordinated you should be fine. I agree with Teri and Art as well. I ALWAYS take good care of the workers!! They notice and they WANT to do a good job for you.

I am very happy for the both of you!


Posts: 5946 | From: Litchfield, NH, USA | Registered: Feb 2000  |  IP: Logged
Jim Mac
Chocoholic Instigator
Member # 113

Icon 1 posted      Profile for Jim Mac   Email Jim Mac         Edit/Delete Post 
Just out of curiousity, were there any financial incentives/penalties written into the contract for meeting/missing the completion date?
Posts: 1907 | From: I hope I'm not repeating myself. Again. And Again. Stop picking on me! Waaahhh!! | Registered: Feb 2000  |  IP: Logged
Voiceguy
2nd Gear
Member # 844

Icon 1 posted      Profile for Voiceguy   Author's Homepage   Email Voiceguy         Edit/Delete Post 
Question: is the builder a national company or local. Our home is a KBHome and they were super about getting everything done on time and then coming back after the move to do touchups and other little stuff like that. Customer service is really important to them, at least it appeared so in our area.
I also got to know the customer service rep well and that helped.

Posts: 350 | From: Chula Vista (San Diego), CA USA | Registered: Dec 2000  |  IP: Logged
JeffY
3rd Gear
Member # 120

Icon 1 posted      Profile for JeffY   Email JeffY         Edit/Delete Post 
I may be pessimistic but I'd say at least 2 months for total completion from where you are now. What about weather problems, material problems. I assume you've picked out all the carpeting, paint colors, tile, cabinets, etc.
Posts: 1163 | From: Rochester Hills, Mi | Registered: Feb 2000  |  IP: Logged
Doug Harden, Pres CICC
1st Gear
Member # 326

Icon 1 posted      Profile for Doug Harden, Pres CICC   Author's Homepage   Email Doug Harden, Pres CICC         Edit/Delete Post 
quote:
Originally posted by JeffY:
I may be pessimistic but I'd say at least 2 months for total completion from where you are now. What about weather problems, material problems. I assume you've picked out all the carpeting, paint colors, tile, cabinets, etc.

Ditto.......

Doug Harden
Project Mgr.
Miller Perdue Architects
(my day job)


Posts: 101 | From: Nashville, IN | Registered: Mar 2000  |  IP: Logged
J.R. Mayer
Site Admin / Moderator
Member # 713

Icon 1 posted      Profile for J.R. Mayer   Author's Homepage   Email J.R. Mayer         Edit/Delete Post 
Well the good news is the house got entirely insulated and sheetrocked in 1 day.. ROCK AND ROLL. He is having the cabinet and hardwood people in this weekend and laid out his schedule.. he said aside from the sod in the front yard.. he is positive its gonna be done by the end up the week of June 10-14... sod will depend on weather.

I will let you all know.. thanks for your comments and input.. its nice to hear it.

- J.R.


Posts: 596 | From: Kansas City | Registered: Aug 2000  |  IP: Logged
   

   Close Topic   Feature Topic   Move Topic   Delete Topic next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:


Contact Us | chirpthird.com | Privacy Statement

Powered by Infopop Corporation
UBB.classic™ 6.7.0